The Quoin Consultancy

Home
|
About us
|
Services
|
* CDM
|
* Health & Safety
|
* Environmental
*
* Planning stage
* Construction stage
* Operating stage
|
* Asbestos Related
|
Site Map
|
Contact us
|
  The Construction Stage

Lockmeadow Footbridge in conjunction with Flint & Neill Partnership
Lockmeadow Footbridge in conjunction with Flint & Neill Partnership
An Environmental Management Plan is a valuable member of the group of site operational documents and forms a site specific operational extension to the Company Environmental Policy and may include.-


The design of bunding and storage tanks for fuel in accordance with regulations introduced in 2001.

Spillage and emergency action plan.

Material handling methods to minimise waste and prevent contamination.

Dust control methods and monitoring.

Noise control methods and monitoring.

Provision of environmental awareness training.

Selection of licensed waste disposal contractors.

An environmental audit of site drainage and out falls from site testing facilities.

Please click next to go to the Operating Stage or click on a specific stage below:

The Planning Stage

The Construction Stage

The Operating Stage

  The Quoin Consultancy  
go to top of page
 
Copyright 2002 The Quoin Consultancy. Revised February 2002. Environmental Services
- The Planning Stage Environmental Services
- The Operating Stage Home Environmental Services
- The Planning Stage Environmental Services
- The Operating Stage